BHS Orchard Ostrava

One of the first stand-alone BESS 8 MW/20 MWh in the Moravian-Silesian Region

Engineering and implementation of a large-capacity stand-alone battery energy storage system in a local distribution system

The project includes a building permit and implementation of a battery energy storage system in the BHS Orchard administrative building. Thanks to the long-term optimisation of the building’s energy operations, we discovered the potential for a large-capacity stand-alone BESS (8 MW/20 MWh) and, in cooperation with BH Securities, obtained an SPV building permit to start construction of one of the first such systems enabled by the LEX RES III amendment.

Key experience and strategic benefit

  • battery energy storage system (BESS)

  • joint venture with a corporate partner

  • bank financing for a stand-alone BESS project