Triangl industrial zone near Žatec

First construction of electrolysers for green hydrogen production in Ústí nad Labem Region

Development of Žatec industrial zone with integrated production of green hydrogen

The project includes a building permit and the implementation of a modern industrial zone with a 40 MW electrolyser for the production of green hydrogen (approx. 4 ha) and two industrial halls (8 ha) powered from the LDS. Its ambition is to become the first and largest permitted project of its type, with SEG gaining valuable experience in engineering large-scale energy and industrial projects and developing cooperation with developers to use the remaining 8 ha for high-end industrial production.

Key experience and strategic benefit

  • engineering of a large-scale energy project

  • obtaining a subsidy of more than CZK 1 bn

  • experience with industrial buildings